Moisture mitigation test before commercial flooring installation
We had a commercial flooring install nearly start on a slab that looked clean and flat. The schedule was tight, so everyone wanted to keep moving. The flooring rep asked for moisture readings first, and that stopped us from installing over a slab that was still outside the adhesive spec. The useful process was not just taking one reading. We reviewed the flooring manufacturer limits, then ran…