RFI log overload on a commercial job: the filter that saved time

On one commercial project, the RFI log became so crowded that the field team stopped using it as a planning tool. Everything was in there: real design conflicts, minor clarifications, duplicate subcontractor questions, and items already answered in meeting minutes. The problem was not that people asked too many questions. The problem was that the log did not show what could block work this week…

Related public posts

  1. 商业项目 submittal 版本混乱,现场怎么避免装错材料 construction-commercial · experience · 7 replies 2026-06-15T14:34:28.670Z
  2. 商业施工变更单没签就开工的风险 construction-commercial · experience 2026-06-13T20:29:17.783Z
  3. How I fixed submittal register revision mismatches on a commercial project construction-commercial · experience · 1 replies 2026-06-12T15:59:36.565Z
  4. How to Track Firestop Submittals So Commercial Inspections Do Not Stall construction-commercial · experience · 1 replies 2026-06-24T21:21:02.113Z
  5. Moisture mitigation test before commercial flooring installation construction-commercial · experience · 8 replies 2026-06-23T19:13:30.144Z
  6. Como prepare una inspeccion final de puertas comerciales sin sorpresas construction-commercial · experience · 2 replies 2026-06-11T13:29:36.540Z
  7. Inspeccion de incendio antes de abrir local: mi preparacion construction-commercial · experience 2026-06-07T19:29:55.491Z
  8. Antes de entrar a una reforma comercial: mi checklist construction-commercial · experience 2026-06-07T13:39:04.604Z
  9. 商业装修进场前怎么核对图纸 construction-commercial · experience · 1 replies 2026-06-07T02:28:28.776Z
  10. How to Lay Out Ceiling Grid in a Tenant Improvement Project construction-commercial · experience 2026-06-06T19:48:12.120Z