How to correct the template elevation deviation on site before pouring the municipal sidewalk

Today, before pouring the municipal sidewalk, the inspector used a laser level to re-measure and found that a section of the template was nearly 3/4 inch lower than the design height. The concrete trucks were already lined up, and some people on site wanted to pour the concrete first and deal with it later. However, if the slope is wrong, it will affect the drainage and ADA cross slope later. I…

Related public posts

  1. A field walk caught the issue our civil drawing package missed construction-civil-works · rant · 2 replies 2026-06-19T16:37:11.684Z
  2. 今天雨后压实度不够,工程施工现场我先看水分还是设备 construction-civil-works · rant · 6 replies 2026-06-17T13:49:36.823Z
  3. silt fence maintenance on construction sites after rain construction-civil-works · rant · 2 replies 2026-06-05T17:24:44.792Z
  4. 路缘石安装线形不直怎么处理 construction-civil-works · rant · 1 replies 2026-06-06T14:00:13.801Z
  5. 沥青摊铺前 tack coat 怎么检查,用量和温度别漏 construction-civil-works · rant 2026-06-21T12:53:49.065Z
  6. How to handle utility conflicts on civil construction projects construction-civil-works · rant 2026-06-04T23:35:22.719Z
  7. Civil construction daily report: what details matter later? construction-civil-works · rant 2026-06-04T21:26:52.707Z
  8. 雨后回填压实度不合格,现场该先查什么 construction-civil-works · experience · 6 replies 2026-06-15T14:34:29.983Z
  9. Utility locate PDF vs field marks: how I avoided a trench delay construction-civil-works · experience · 5 replies 2026-06-15T05:19:11.654Z
  10. How I caught a coordinate shift in a civil survey CSV import construction-civil-works · experience · 2 replies 2026-06-12T15:59:37.239Z