A field walk caught the issue our civil drawing package missed
Before a small civil works phase, the drawing package looked ready. The grading plan, utility sheet, and traffic control plan had all been reviewed. During a field walk, though, we noticed the existing inlet elevation did not match the survey note used in the plan. It was not a huge difference on paper, but it was enough to affect drainage and the tie-in detail. We paused the crew before…